Technical review and production planning

01 / Prepare

  1. Spec Review & DFM

    Stage 01

    We review drawings, materials, and tolerances with you, then flag manufacturability risks before production begins.

    • Drawing review
    • Material & tolerance review
    • DFM risks
  2. Supplier Selection

    Stage 02

    We match the programme to qualified production partners with the required capability, capacity, and quality controls.

    • Capability match
    • Capacity review
    • Quality controls
Machined metal component resting on technical drawings

Inspection during and after production

02 / Control

  1. In-Process Inspection

    Stage 03

    We check critical production stages and address deviations while there is still time to correct them.

    • Critical checkpoints
    • Deviation review
  2. Final Acceptance

    Stage 04

    We validate finished parts against agreed specifications and review the inspection and material documentation before dispatch.

    • Specification check
    • Inspection records
    • Material documents
Worker measuring a metal component at a machine

Documented dispatch

03 / Deliver

  1. Delivery

    Stage 05

    We coordinate shipment with the agreed traceability, inspection, and delivery records in one package.

    • Shipment coordination
    • Traceability
    • Delivery records